Originally, the Jai Hind metro station was planned being elevated. However, the AAI objected that the elevated stretch up to the airport could possibly pose a danger to aircraft, so the route was even more reworked plus the station was shifted underground, a hundred and fifty m with the Airport terminal https://sethtdins.tribunablog.com/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf-46549862