As seen through the figure under, steady auger is utilized to drill the borehole, elevate up drilled soil, and pour concrete although the auger is moved up. Subsequently, the borehole would not need to have casing or hydrostatic tension to avoid harm to the borehole wall. It is also well https://juliusagghb.qowap.com/91887985/a-review-of-cast-in-situ-piles